JG180LT with 18 tons of heavy load structure to break through the bottleneck of railway construction, designed for contact network dense areas. Hydraulic clam shell grab equipped with insulation protection system; Multi-stage boom combined with retractable chassis can achieve zero collision precision operation in the limit space such as bridge repair belt and tunnel lining area. The reinforced track adopts the design of split ground reinforcement, which is as stable as a rock on the soft foundation of marshland and frozen soil slope, doubling the efficiency of the Siberian Railway freezing damage control and the Southeast Asian rainy season double line project.
Read More